محتوى الدورة
Inv-6 | Manufacturing Model Formulae (in Hindi)(without and with shortage) in Inventory Management DF-2: Quantitative Methods of Forecasting (Hindi) | Naïve Approach | Simple Average DF-3: Quantitative Methods of Forecasting (Hindi) | Simple Moving Average | Weighted Moving Average DF-4: Exponential Smoothing in Hindi | Demand Forecasting | α (Alpha): Smoothing Coefficient DF-5: Exponential Smoothing including Trend | β Beta Smoothing Coefficient for Trend DF-6: Trend Analysis Method of Demand Forecasting | Graphical Method and Equation Method DF-7: Associative Model for Demand Forecasting | Linear Regression Method | Method of Least Squares DF-8: Measurement of Errors in Demand Forecasting | MFE, MAD, MSE, MAPE (in Hindi) DF-9: Exponential Smoothing Including Trends and Mean Absolute Deviation using MS Excel Integrated Material Management Relevant Costs in Inventory Management | EOQ | Carrying Cost | Ordering Cost | Shortage Cost Inv-1 | Introduction to the Concept and Relevant Costs of Inventory Management (in Hindi) Inv-2 | ABC Analysis for Classification of Inventory in inventory Management (in Hindi) Inv-3 | EOQ (Economic Order Quantity) Model in Inventory Management (in Hindi) Inv-4 | Introduction and Comparison of Purchase Model & Manufacturing Model in Inventory Management Inv-5 | Purchase Model Formulae (in Hindi)(without and with shortage) in Inventory Management DF-1: Demand Forecasting | Qualitative Methods of Forecasting | Forecasting v/s Prediction (Hindi) Inv-7 | Formula recap of Purchase and Manufacturing Model for Inventory Management Inv-8 | Example of Purchase Model and Manufacturing Model without Shortage in Inventory Management Inv-9 | Example of Purchase Model and Manufacturing Model without Shortage in Inventory Management Inv-10 | Example of Price Break and Quantity Discount Model in Inventory Management Inv-11 | Reorder Level and Service Level | Probability of Inventory Stock-out WS-1 | Introduction (Part 1) of Work Study, Method Study Work Measurement, Time Study, Work Sampling WS-2 | Introduction (Part 2) of Work Study, Method Study Work Measurement, Time Study, Work Sampling WS-3 | Easy, Beginner level Examples in Time Study Work Sampling WS-4 | Examples in Time Study Work Sampling Total Productive Maintenance | Preventive and Breakdown Maintenance JS-1: Job-shop Scheduling using FCFS(First Come First Serve) | Example 1 JS-2: Job-shop Scheduling using FCFS(First Come First Serve) | Example 2 JS-3: Job-shop Scheduling (in Hindi) using FCFS(First Come First Serve) | Example 3 JS-4: Job-shop Scheduling (in Hindi) using FCFS(First Come First Serve) | Example 4 PPC-4 | Aggregate Planning (in Hindi) | Pure Strategies | Mixed Strategies Intro-2: Evolution of Production and Operations Management | History of POM Intro-3: Shift of Focus in Production/Operation Management | Paradigm Shift in POM (in Hindi) Intro-4: Comparison between Goods and Services in Production and Operations Management (in Hindi) Intro-5: Factors Affecting Selection of Plant Location (in Hindi) Intro-6: Factor Rating Method for Location Planning (Hindi) | Selection of Plant Location Intro-7: Locational Break Even Analysis (in Hindi) | Methods of Selecting Plant Location Intro-8: Center of Gravity Method of Plant Location | Production Operation Management (in Hindi) Intro-9: Essentials/Characteristics of a Good Plant(Facility) Layout (in Hindi) Intro-10: Product and Process Layout | Assembly Line and Job-Shop Production Process (in Hindi) Intro-11: Comparison of Assembly-line Production System with Job-Shop Production System Intro-12: Comparison of Product layout and Process Layout (in Hindi) Intro-13: Comparison of Project Layout with Product Layout and Process Layout (in Hindi) PPC-1 | Production Planning and Control | Planning, Action and Control Phase | Manish Tanwar PPC-2 | Capacity Planning - 1 | Design Capacity | System Capacity | Production Operation Management PPC-3 | Capacity Planning - 2 | Long/Medium/Short Term Planning | Production Operation Management Intro-1: Introduction of Production/Operation Management as a Functional Department PPC-5 | Pure Strategies for Aggregate Planning | Hire/Fire, Subcontract, Constant Production Level PPC-6 | Mixed Strategy in Aggregate Planning | Hire/Fire, Subcontract, Constant Production, Overtime PPC-7 | Master Production Schedule (in Hindi) | Production Planning and Control | Manish Tanwar PPC-8 | Material Requirement Planning Introduction (in Hindi) | MRP-I | Manish Tanwar PPC-9 | Material Requirement Planning (in Hindi) | Example-1 | MRP-I | Manish Tanwar PPC-10 | Material Requirement Planning (in Hindi) | Example of MRP-I | Manish Tanwar PPC-11 | Economic Order Quantity (EOQ) Method of Lot Sizing for MRP-1 (in Hindi) | Manish Tanwar PPC-12 | MCP - Minimum Cost per Period | Lot Sizing Method in MRP-I (in Hindi) | Manish Tanwar PPC-13 | Least per Unit Cost (LUC) Method of Lot Sizing for MRP-1 (in Hindi) | Manish Tanwar PPC-14 | Period Order Quantity (POQ) Method of Lot Sizing for Material Requirement Planning (Hindi) PPC-15 | Part Period Balancing (PPB) for Lot Sizing in Material Requirement Planning (in Hindi) PPC-16 | Introduction to Line Balancing PPC-17 | Line Balancing | Rank Positional Weight Method | Production Operation Management PPC-18 | Line Balancing | RPW Method | Rank Positional Weight Method | POM

للحصول على شهادة

  • 1- التسجيل
  • 2- مشاهدة الكورس كاملا
  • 3- متابعة نسبة اكتمال الكورس تدريجيا
  • 4- بعد الانتهاء تظهر الشهادة في الملف الشخصي الخاص بك